US$ 19.99
Don't forget to keep the lovely packaging
The Graham Farish Class 60 is back and better than ever before and we are delighted to present this model of No
• Two cab types
An inbuilt thermal imaging system contained within the Mole’s drill bit ensures that buried individuals are not endangered by rock falls caused by the drill’s movement
4P-020-402 GWR Toplight Mainline City GWR All Brown Third Brake 3756 Set 5 Class-60 Don't forget to keep theThe first order for these coaches was placed in 1915 but, due to the First World War, they were not built until 1920. The second batch was completed in 1921. Six sets of coaches were produced with each set comprising six coaches. The coaches were close coupled and constructed with a steel body rather than the traditional wooden panelling. Due to the restrictive loading gauge of the London Underground tunnels, the carriages are 7 inches lower than
US$ 19.99
US$ 19.99
US$ 39.99
US$ 39.99
US$ 39.99
US$ 14.99
US$ 49.99
US$ 39.99